Start with the agreed contract amount
Review the fixed-price job, approved variations and what has already been claimed. Check the stage against the actual agreement, including any conditions that affect what is due.
Reconcile before drafting
Compare the proposed claim with the revised contract and earlier billing. Check the customer, amount and remaining balance in the web billing view before issuing the document.
Reconcile the stage with the contract balance
Open the fixed-price job with access to its billing details and permission to create invoices. Compare the agreed stage and its supporting records with the Billing card. If a variation was just approved, reload the job and check that the revised contract reflects it. Review the earlier claims, including drafts that already count against the balance.
Open the billing action on the job and select part of the remaining balance for a progress claim after an earlier deposit. Review the amount and invoice date before creating the draft. Check GST and the agreement in the draft before issuing it with the separate invoice permission.
Use the actual contract to decide what can be claimed
Prepare the claim against the agreed stage or milestone, with the supporting completion evidence. Check applicable contract and payment requirements before issuing it.
Review changes before they enter the commercial total
Keep the requested change, scope, price, time effect and approval together. A changed cost estimate is not an approved variation. Check whether a variation belongs in this claim and whether retention or another contractual adjustment applies; do not infer its treatment from a generic example.
Reconcile a simple illustrative claim without retention
Assume the agreed cumulative value ready for this claim is $20,000 and a separately approved change adds $2,000, all excluding GST. If previous invoices total $12,000 of that value, the next amount is $10,000 before GST. This example excludes retention and other adjustments; use the actual contract for them.
| Illustrative claim reconciliation | Amount excluding GST |
|---|---|
| Cumulative agreed value for this claim | $20,000 |
| Approved change included in this claim | $2,000 |
| Cumulative total | $22,000 |
| Previous invoices against that value | $12,000 |
| Next amount before other adjustments | $10,000 |
Check the record in the required product plan
Fixed-price claims are available in the web app on all plans, subject to usage limits. You need View Jobs and Create Invoices. Project planning and variation approvals require Professional. Inspect the billing preview and contract total with a sample stage and change. The product supports the calculation and record; it does not decide your contractual entitlement to payment.
For the wider product evaluation around this claim process, use the construction software overview and demo project to inspect stage scope, ownership and unresolved questions. Those project records support a delivery review; the actual fixed-price contract, approved changes and previous claims still need their own reconciliation.
Review the draft, recipient and balance before sending
Check the agreed price, approved extras, previous invoices, payments and any disputed amount. Verify the payer and required invoice reference. Confirm GST treatment for your registration and supply, and check the ATO requirements for the document. Issuing an invoice and receiving payment are separate events.
AxiomBlue connects quotes, job records and invoicing. Review the job’s billing method and draft rather than assuming every recorded cost is a customer charge. Core invoicing is available on Free within its limits. Professional adds variations and advanced billing processes; online sending and payments need a connection.
Sources: ATO tax invoice requirements
Common questions
Questions about this process
Is a progress invoice proof that the client has paid?
No. Keep the claimed amount, invoice status and payment record separate. Review any certification, dispute or adjustment through the process required by the agreement.
Put it to work
Your practical checklist
- Verify the contract’s claim basis and evidence.
- Include only the changes approved for this claim.
- Reconcile cumulative value and prior billing.
- Review retention or other adjustments under the contract.
- Check the payer, document and outstanding balance.
See the records in Axiom Blue
Try the workflow with a familiar job.
Features and usage limits vary by plan. Review the tools relevant to your process before choosing your setup.