Axiom Blue / Plan the work

Find a project slot without displacing a maintenance round

Enter the project job’s expected duration and check the crew calendar. Review the proposed assignment against regular visits before offering a date.

More guides for this industry →

By Axiom Blue · Updated 10 November 2026 · 2 min read

Allow for the whole garden project

Record the work address, likely duration and any access restriction. Check the returning maintenance customers already booked with that crew.

Review the slot before offering it

Preview the placement and compare the proposed date, travel and assignment with the existing day. If the project displaces a visit, decide which booking to move before confirming either with a customer.

Check the proposed date before committing the crew

Give the unassigned job a site and estimated duration. In Crew Calendar, choose Auto Schedule, select the job, set the first day and simulate. The sample preview proposes the Design Team for the site visit on 15 December, from 3:30 to 4:30 pm.

AxiomBlue · Proposed landscaping site visit assignment
Auto Schedule shows the proposed date and afternoon time for the site visit.
Read the proposed date and time before applying any schedule.

Check the proposed date, crew and any unassigned work before applying a schedule. Preview needs View Schedule. Applying needs Scheduling Full Management. Use Professional Job Series for repeat visits, and break longer project work into stages if that helps the handover.

Separate today’s maintenance from the quoted transformation

A regular garden visit and a quoted refresh at the same property need clear task and billing boundaries. Put project materials and prerequisites on the project work, and keep the repeat visit’s agreed scope visible. The crew should be able to identify which work they are attending to do.

Plan the longer job without quietly dropping the round

Illustrative week: a two-day garden refresh arrives alongside fortnightly maintenance. Check the skills and availability of the team and the required delivery. Review which repeat visits still fit, which need a different assignment and which need a customer conversation before moving.

Review the proposal before committing the day

AxiomBlue’s assisted scheduling uses recorded duration, bookings, working hours and travel to propose assignments. Professional adds crew skills and approved leave. Inspect the people, times, warnings and work not placed before applying; keep inputs current. Job readiness and customer arrangements still need your review. Individual scheduling is available on Free within limits and on Basic.

Use a wet-day change as a review, not a blanket rule

For an affected date, AxiomBlue’s day-rescheduling controls can preview moving work; weather filtering uses jobs you have marked weather-sensitive. Check the ground conditions and work type yourself. After applying a reviewed change, inspect the actual result and confirm revised arrangements. A moved booking does not itself notify every customer.

Common questions

Questions about this process

Should every landscaping job move when it rains?

Assess the actual work and conditions. Mark the relevant jobs as weather-sensitive, review the affected work and confirm the revised plan. Weather sensitivity is a recorded setting, not an automatic judgement about the site.

Put it to work

Your practical checklist

  1. Keep maintenance and project tasks distinct.
  2. Record crew requirements and multi-day durations.
  3. Confirm material delivery and site readiness.
  4. Inspect the work left without a suitable place.
  5. Review weather changes and customer arrangements.

See the records in Axiom Blue

Try the workflow with a familiar job.

Features and usage limits vary by plan. Review the tools relevant to your process before choosing your setup.

Product instructions